Authors: | Ait El Cadi, Abdessamad Ben Atitallah, Rabie Hanafi, Saïd Mladenović, Nenad Artiba, Abdelhakim |
Title: | New MIP model for multiprocessor scheduling problem with communication delays | Journal: | Optimization Letters | Volume: | 11 | Issue: | 6 | First page: | 1091 | Last page: | 1107 | Issue Date: | 1-Aug-2017 | Rank: | M21 | ISSN: | 1862-4472 | DOI: | 10.1007/s11590-014-0802-2 | Abstract: | In this paper we consider scheduling tasks on a multiprocessor system, taking into account communication delays. We propose a new Mixed Integer Program (MIP) formulation that drastically reduces both the number of variables and the number of constraints, when compared to the best mathematical programming formulations from the literature. In addition, we propose pre-processing procedures that generates cuts and bounds on all variables, reducing the solution space of the problem as well. Cuts are obtained by using forward and backward critical path method from project management field, while the upper bound is derived from the new greedy heuristic. Computational experience shows advantages of our approach. |
Keywords: | Communication delay | CPLEX | Mixed integer program | Multiprocessors | Task scheduling | Publisher: | Springer Link |
Show full item record
SCOPUSTM
Citations
9
checked on Dec 20, 2024
Page view(s)
13
checked on Dec 22, 2024
Google ScholarTM
Check
Altmetric
Altmetric
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.